Thursday, 28 April 2016

Group Project TB2: Production Diary: Animatic

This is the animatic I created for the story. I created this in flash as I believed that I would save time by doing an animatic instead of a storyboard. The only problem I found with the clip was that it was two seconds too short for the brief, so I would have to add some filler animation in the final animation.  


No comments:

Post a Comment